Wellington Middle/High School – Poudre School District

Location: Wellington, Colorado
Budget: $130 million
Size: 247,500 SF
Structural and Civil Engineering

Project Description

JVA was the civil and structural engineer on this one of two new Poudre School District facilities constructed almost simultaneously. The building features a variety of learning spaces and designed with expansion in mind, allowing for the transition to a high school only program as the student population increases. Glulam roof beams, radiating over the commons spaces and main hallways, are supported by precast concrete perimeter walls forming a central learning park.

Other Projects

Highlands Elementary School

Colorado School of Mines McNeil Hall and Parking Garage

UCCS Hybl Sports Medicine & Performance Center

CSU Shepardson Renovation and Addition

Mead Elementary School

Health and Medical Center - Colorado State University

Aerospace Engineering Building Site Design

Mt. Evans Outdoor Lab School Decentralized Wastewater Treatment Facility

Scroll to Top