Lochbuie Wastewater Treatment Plant Improvements

Location: Lochbuie, CO
Environmental Engineering

Project Description

JVA was hired by the Town of Lochbuie to design an influent pump station (IPS), grit removal and solids dewatering improvements to their existing 2.0 MGD WWTF. The IPS design included the abandonment of an old pump station and construction of a new wet well dry pit influent pump station integrated with preliminary treatment. JVA conducted a detailed hydraulic evaluation to determine the optimum pump capacities for meeting existing minimum, average and peak hourly flow demands as well as sizing the station to ultimately meet buildout flow demands. This project was delivered as a CMAR with milestone deliverables at the 60 percent design for the CMAR RFP and procurement.